Our Manhole PowerArm™ makes lifting and replacing manhole covers easier than ever. Just drive within 3 feet of the center of the manhole cover and let the Manhole PowerArm™ adjust to your location. The “Arm” has a 3ft., 180° swing radius and a double jointed elbow that allows the positioning of the magnet (sold separately) in the center of the manhole cover. Once the magnet is centered, turn the magnet to the “lock-on” position and use the winch control to start lifting the manhole cover. When the manhole cover is clear from its rim, swing the manhole cover away. Reverse the steps to replace the manhole cover. CAUTION: Manhole covers must be loose prior to lifting.
Green Pin BigMouth® Bow Shackle BN
Grade 8 bow shackle with safety bolt and wider shackle mouth Product details Productcode G-4263 Material bow and pin alloy steel, Grade 8, quenched and tempered Safety factor MBL equals 6 x WLL Finish hot dipped galvanized Temp. range -20°C up to +200°C Certification...